Turning a unfinished Laundry rm/Breezeway in a fully functioning Laundry room. Consisting of total demolition, updating Plumbing, Electrical and new custom designed cabinets to bring this room into the 21st century.
8/18/10
Demolition starts
Wensday finaly started demo. Packed-up and moved stuff in cabinet and moved refriderator to dining room.
Finished removing T&G paneling and upper cabinet. Removed sheetroock, who ever installed the sheetrock previously got a little overzelous with the nails. Got about 3/4 of sheetrock & insulation form the walls removed before I called it a day. Will finish with the walls and ceiling also removing the floor underlayment tomorrow.
<
Had to show a picture of the wrong way to install insulation. As you can notice in the pic the dark areas are from air movement into the garage.